Incoming Parts: Steel Part – Inspection and Process Qualifying
New
Reconditioned
Used
Parts that have been manufactured by IPS or purchased and have never been installed or used
Parts that have less than 5% wear will receive recondition process.
Parts that have more than 5% wear but less than 10% will receive used process.
Part Conditioning Process
Washed 1:
N/A
Reworked:
Washed 2:
Media Blasted:
Media Blasted: ed:
Media Blasted: d:
Part Finishing
Black Oxide:
Anti-Rust Sealant:
Functionality:
100%
95-100%
90-100%
Physical Condition:
85-95%
Surface Finish:
Stocked:
Part Usage
Replacement:
Refurbishing:
Reconditioning:
Rebuilding:
Remanufacturing:
Manufacturing:
Non-Qualifying Incoming Parts: Incoming Parts that do not meet the minimal qualifying requirements will not be processed and are instantly scrapped